EV Charger Installation
Level 2 home and small business chargers installed by a licensed master electrician in Shepherdstown, Charles Town, Martinsburg and across the Eastern Panhandle.
Sized Right. Installed Safely.
A Level 2 charger draws a large load for hours at a time, so the details matter: the right wire gauge, a dedicated circuit, correct breaker sizing, solid grounding and bonding, and GFCI protection where code requires it.
Every install starts with a check of your panel and service capacity, so you only upgrade if you need to. Curious about cost? See what drives EV charger installation cost.
FROM FIRST CALL TO FIRST CHARGE
our install process
A clean, code-compliant install that passes inspection and charges reliably every day.
- Consultation. We talk through your vehicle, where you park and which charger you have or want.
- Site and panel check. We look at panel capacity and plan the shortest clean route from the panel to the charger.
- Installation day. On time, organized and tidy. Dedicated circuit, charger mounted and connected, permit inspection scheduled.
- Walkthrough. We test the charger with you and show you its settings before we leave.
Options
Chargers We Install
Hardwired or plug-in, inside the garage or out by the driveway.
Tesla Wall Connector
Hardwired for the highest charging speed your circuit allows. Works with Teslas and many other EVs.
ChargePoint & Other Level 2
ChargePoint and other listed Level 2 chargers, installed to the manufacturer's instructions.
NEMA 14-50 Outlets
A heavy-duty 240-volt outlet with GFCI protection for a plug-in or mobile charger.
Outdoor & Driveway
Outdoor-rated chargers with the circuit run in conduit to where you park.
COMMON QUESTIONS
ev charger faq
Answers to what people ask most before an install. Call 681-283-0093 with anything else.
What chargers do you install?
Level 2 chargers, including Tesla Wall Connectors, ChargePoint and other brands for Ford, Rivian, Chevy, Hyundai and more. We can also install a heavy-duty NEMA 14-50 outlet for a plug-in charger.
How long does installation take?
A typical garage install takes part of a day. Long runs, outdoor chargers or service upgrades take longer.
Do I need a permit?
Yes. A new 240-volt circuit is permitted and inspected work, and we handle the permit.
What if my panel does not have room?
Options include a subpanel, a load-management device, setting the charger to a lower output, or a 200 amp service upgrade. We recommend the least expensive option that works.
Can you install a charger outside?
Yes. We use an outdoor-rated charger and run the circuit in conduit to your driveway or parking area.
Is Level 2 really faster?
Yes. A Level 2 charger can add many times more range per hour than a standard 120-volt outlet, enough to refill most daily driving overnight.